Saijowo Lifepo4 Battery 7kWh Solar Lifepo4 48v 150Ah Server Rack Energy Storage Battery

Communication interfaces: CAN&RS485; 

Protection: Over-current, Over-voltage, Low-voltage, Over-temperature, Low-temperature protection, Short-circuit protection, etc. 

Cycle life: 3000 cycles @80%DOD

Warranty: 3-5 years

Lead time: 15-20 days

Saijowo Lifepo4 Batteries 7kWh Solar Energy Storage Batteries 48V 150Ah Lithium Sever Rack Battery Module for UPS

Specification

Basic Characteristics

Nominal Voltage

48V

Nominal Capacity

150AH

Nominal Energy

7200Wh

Combination Method

15S1P

Cycle Life

≧3000 cycles@80%DOD

Months Self Discharge

1%/Month

Efficiency of Charge

>97%

Efficiency of Discharge

>98%

Standard Charge

Recommended Charging Voltage

55.0V

Recommended Charging Current

20A

Max.Charging Voltage

55.5V

Max.Charging Current

50A

Standard Discharge

Recommended Discharging Current

100A

Max.Peak Current

200A(100~300ms)

Discharge Cut-off Voltage

40.5V

Environmental

Charge Temperature

0°C~55°C

Discharge Temperature

-20°C~60°C

Storage Temperature

0°C~40°C

Other

IP Class

IP30

Plastic Case

Metal

Dimension (in./mm.)

442*467*132

Weight (lbs./kg.)

About 60

Others (optional)

Anti-theft function,LCD display

Features


  1. Higher Power : provides twice the power of a lead acid battery and even a high discharge rate while maintaining a high energy capacity.
  2. Lighter Weight : about 40% of the weight of a similar lead acid battery. Alternatives to lead-acid batteries.
  3. Long lifespan:  up to 20 times the cycle life and 5 times the float/calendar life of a lead acid battery, helping to minimize replacement costs and overall costs of ownership
  4. Superior Safety: Lithium Iron Phosphate chemistry eleminates the risk of explosion or combustion due to high-impact overcharging or short-circuiting.
  5. Easy To Install



How it works?

How to install?

1.Put the battery into the cabinet

2.Drive the 4pcs screws

3.Connect the cables between battery modules

4.Connect the cables to inverter


Power On

Double check all the power cable and communication cable

(1) ON/OFF

    Switch on all the battery modules and the green LED light below will be on

(2) Set ADD

    Set ADD follow ADD instruction, pack 1 will be host, others are slavesties in all shapes.



Assembly Process

Packing&Shipping

Application